difference between Plot plan and construction work area
English to Arabic
Tech/Engineering
Construction / Civil Engineering
construction
this is the context of the mentioned terms:
The primary input to the creation of the CWAs is the plot plan. The project construction personnel (being Owner, Engineering contractor and/or Construction Manager personnel, depending on availability), will meet to review the site layout and determine the best locations for Construction work areas breaks. Ideally, these breaks should be made at logical locations, such as the boundaries of a tank farm or the end of a pipe rack.
The primary input to the creation of the CWAs is the plot plan. The project construction personnel (being Owner, Engineering contractor and/or Construction Manager personnel, depending on availability), will meet to review the site layout and determine the best locations for Construction work areas breaks. Ideally, these breaks should be made at logical locations, such as the boundaries of a tank farm or the end of a pipe rack.
Proposed translations
(Arabic)
4 +1 | الفرق بين مخطط قطعة الأرض و منطقة أعمال البناء ( منطقة الانشاءات ) | Motaz Fahmy |
Proposed translations
+1
1 hr
الفرق بين مخطط قطعة الأرض و منطقة أعمال البناء ( منطقة الانشاءات )
الفرق بين مخطط قطعة الأرض و منطقة أعمال البناء ( منطقة الانشاءات )
Something went wrong...