May 14, 2021 00:55
3 yrs ago
12 viewers *
English term

base flood elevation

GBK English to French Tech/Engineering Architecture
Definition from A Planner's Dictionary:
That elevation, expressed in feet above mean sea level, to which flooding can be expected to occur on a frequency of once in every 100 years, or which is subject to a 1 percent or greater chance of flooding in any given year.
Example sentences:
The Planning Board shall require that all proposals for development greater than 50 lots or 5 acres, whichever is the lesser, include Base Flood Elevation (BFE) data within such proposals (i.e. floodplain boundary and 100-year flood elevation). (Gov. of New Hampshire)
FEMA is providing $8,438,022 to elevate 31 historic properties in New Orleans. All of the structures are located in the special flood hazard area and will be raised to at least one foot above the base flood elevation. (KATC)
Insurance companies use the elevation certificate to compare your property’s elevation to Base Flood Elevation (BFE), which determines the cost to insure your risk of flooding. The NFIP estimates that BFE has a 1% chance of floodwaters reaching the building. The higher your lowest floor is above the BFE, the lower your flooding risk; therefore, you may receive a lower flood insurance premium. (Forbes)
Proposed translations (French)
4 +1 hauteur de submersion de base
Change log

May 3, 2021 14:40: changed "Kudoz queue" from "In queue" to "Public"

May 14, 2021 00:55: changed "Stage" from "Preparation" to "Submission"

May 17, 2021 01:57: changed "Stage" from "Submission" to "Selection"

May 24, 2021 01:56:

Jun 13, 2021 01:56:

Jul 13, 2021 01:56:

Proposed translations

+1
13 hrs

hauteur de submersion de base

Definition from J.S. Held:
La hauteur de submersion de base (BFE) est le niveau représentant 1 % de chance d'inondation
Example sentences:
Une grande variété de méthodologies et de modèles analytiques peuvent être utilisées pour établir la Hauteur de Submersion de Base (risque annuel de un pour cent) (Eurosion)
Le bâtiment de 15 837 pieds carrés sera surélevé de plus de 2 pieds au-dessus de la hauteur de submersion de base qui est exigée par la FEMA pour éviter que le marché ne soit endommagé par les futures tempêtes (Etat de New York)
Peer comment(s):

agree François Tardif
60 days
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search