This question was closed without grading. Reason: Other
Jun 19, 2021 13:35
3 yrs ago
8 viewers *
English term

column direct foundations

English to French Tech/Engineering Construction / Civil Engineering road project
Bridge Construction
As presented in Section 2.4.4.4 the Route de l’Esclave Project plans the construction of 1 bridge along the axis of the road. The steps planned for the construction of the new bridges are as follows and illustrated with construction methodology.
 Step 1: Clearance of vegetation and cleaning;
 Step 2: Earth-moving to open foundations;
 Step 3: Infrastructure – abutment and column direct foundations, in the bridges where they exist;
 Step 4: Mesostructure – elevation of the abutments and pillars, in the bridges where they exist;
 Step 5: Superstructure – deck, including support devices and expansion joints; and
 Step 6: Finishing – drainage, sidewalks and kerbs, cornices and guard-rails.