Aug 10, 2019 23:21
4 yrs ago
18 viewers *
English term
Master TRF
English to Polish
Tech/Engineering
Electronics / Elect Eng
Test specification:
Standard………………………………..……….: IEC 61643-11: 2011 (First Edition)
Test procedure………………………..………..: XXX
Non-standard test method : N/A
Test Report Form No……………...…..: IEC61643 11A
Test Report Form(s) Originator……………….: XXX
Master TRF…………………….……………….: Dated 2011-12
Standard………………………………..……….: IEC 61643-11: 2011 (First Edition)
Test procedure………………………..………..: XXX
Non-standard test method : N/A
Test Report Form No……………...…..: IEC61643 11A
Test Report Form(s) Originator……………….: XXX
Master TRF…………………….……………….: Dated 2011-12
Proposed translations
(Polish)
4 | zharmonizowany formularz badań |
Andrzej Mierzejewski
![]() |
References
IECEE Operational Document |
geopiet
![]() |
Proposed translations
2 days 9 hrs
Selected
zharmonizowany formularz badań
Na podstawie informacji z dyskusji: "the Master TRF only for blank harmonized form-sheet of the Test Report".
I bardzo proszę nie kalkować wyrazu "test", ponieważ EN test = PL badanie, próba, a nawet (w szkole): klasówka, praca klasowa itd.
Chyba, że test polega na zaznaczeniu jeden z kilku możliwości, np.: Czy Cheops to nazwisko:
astronoma,
rolnika,
pisarza,
króla?
;-)
--------------------------------------------------
Note added at 2 dni 10 godz. (2019-08-13 09:57:38 GMT)
--------------------------------------------------
Autokorekta!!!:
...polega na zaznaczeniu jednej z kilku możliwości...
:-[
I bardzo proszę nie kalkować wyrazu "test", ponieważ EN test = PL badanie, próba, a nawet (w szkole): klasówka, praca klasowa itd.
Chyba, że test polega na zaznaczeniu jeden z kilku możliwości, np.: Czy Cheops to nazwisko:
astronoma,
rolnika,
pisarza,
króla?
;-)
--------------------------------------------------
Note added at 2 dni 10 godz. (2019-08-13 09:57:38 GMT)
--------------------------------------------------
Autokorekta!!!:
...polega na zaznaczeniu jednej z kilku możliwości...
:-[
4 KudoZ points awarded for this answer.
Reference comments
16 hrs
Reference:
IECEE Operational Document
IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System)
TRF – Development, maintenance and use
- https://www.iecee.org/documents/refdocs/downloads/od-2020_ed...
-----------
Master TRF: The date of Master TRF shall be the date of TRF publication. - page 13
-
6.3.7 The “Master TRF date” shall be the TRF publication date. The publication date will be different for the TRFs published on the IECEE website “under comments” and the final version TRFs. Once the TRF is finalized, the publication date is replaced with the new date, which designates the final version - page 29
-
6.4.2 The Test Report Form Number stays the same until the editions or amendments of the Standard have changed however; the Master TRF date must be changed with each correction - page 29
-
The IECEE Secretariat maintains a list of completed TRFs and TRFs in preparation, which includes the expected completion date.
The assigned TRF Originator shall always inform the IECEE Secretariat on completion of the relevant TRF(s). The completed Master TRF(s) shall be sent by e-mail to the IECEE Secretariat in Geneva for distribution. - page 61
-
Annex I - Request form for corrections to the published TRF - page 62
TRF – Development, maintenance and use
- https://www.iecee.org/documents/refdocs/downloads/od-2020_ed...
-----------
Master TRF: The date of Master TRF shall be the date of TRF publication. - page 13
-
6.3.7 The “Master TRF date” shall be the TRF publication date. The publication date will be different for the TRFs published on the IECEE website “under comments” and the final version TRFs. Once the TRF is finalized, the publication date is replaced with the new date, which designates the final version - page 29
-
6.4.2 The Test Report Form Number stays the same until the editions or amendments of the Standard have changed however; the Master TRF date must be changed with each correction - page 29
-
The IECEE Secretariat maintains a list of completed TRFs and TRFs in preparation, which includes the expected completion date.
The assigned TRF Originator shall always inform the IECEE Secretariat on completion of the relevant TRF(s). The completed Master TRF(s) shall be sent by e-mail to the IECEE Secretariat in Geneva for distribution. - page 61
-
Annex I - Request form for corrections to the published TRF - page 62
Discussion
(How would you describe "Master TRF" in plain English? Is it some kind of a "summary" of an accepted "test reports", or something else?)
-------
Dear [x],
Related to your questions below, we can provide the following feedback.
We usually refer to TRF (Test Report Form) or the Master TRF only for blank harmonized form-sheet of the Test Report. Once a TRF is used by a CBTL as part of an actual project, and the test results and evaluations are filled into the form, we call it a Test Report (TR) or more precise a CB Test Report (CB TR). Our rules on how to create and/or modify a TRF, and how a TRF shall be used can be found in our Operational Document OD-2020 (https://www.iecee.org/documents/refdocs/downloads/od-2020_ed...
The list of our registered CBTLs and NCBs and their relevant scope, you can find on the below link.
CBTLs: https://www.iecee.org/dyn/www/f?p=106:42:0
NCBs: https://www.iecee.org/dyn/www/f?p=106:41:0
We hope this feedback supports your inquiry, but if you need further information, feel free to contact us.
With best regards
Wolfram
Mr. Wolfram Zeitz
IECEE Deputy Secretary
Dziękuje za pomoc.
niestety, bez hasła nie ma dostępu ....
-------
tu więcej "IEC Test Report Forms (TRFs)" - https://www.iecee.org/dyn/www/f?p=106:61:0
Test Report Form(s) Originator……………….: XXX
Master Test Report Form…………………….……………….: Dated 2011-12